Paper-Based Sample Case Studies

Corrugate Annual Spend
of Over $150 Million
Engaged post savings initiative (RFP/preliminary negotiations) Improved previously negotiated savings by over 30% No change in supplier, no change in materials or package design No change in supplier, no change in materials or package design
Corrugate Annual Spend
Of $6 Million
Achieved 14% No change in supplier, no change in materials or package design 14% Savings
Corrugate Annual Spend
Of $25 Million
Identified 17% Savings Current supplier unwilling to close GAP Introduced new supplier who immediately met target pricing 17% Savings
Folding Board Annual Spend
of $9 Million
Identified 8% Savings Achieved 8.5% No change in supplier, no change in materials or package design 8.5% Savings
Folding Board Annual Spend
of $5 Million
Achieved 17% No change in supplier, no change in materials or package design 17% Savings